Description
Funded under European Union's Horizon 2020 Programme, OPERA project’s main objective is to reduce the time to market of wave energy, by further advancing in 4 key innovations aiming to reduce up to 50% the Levelized Cost of Energy (LCOE) projections of a floating Oscillating Water Column (OWC) technology. As part of project activities, a series of Power Take-Off (PTO) and Control Law (CL) tests were carried out using IDOM's MARMOK-A-5 wave energy converter, while this was deployed in the Biscay Marine Energy Platform (BiMEP) from October 2018 to June 2019. The datasets herein contain a collection of PTO and CL testing results obtained during this extensive testing campaign, providing quantitative evidence of the performance of both innovations.
Further documentation regarding Power Take-Off, Control Law and WEC instrumentation system is available in the "Publications" section of the project web page: http://opera-h2020.eu/.
Further documentation regarding Power Take-Off, Control Law and WEC instrumentation system is available in the "Publications" section of the project web page: http://opera-h2020.eu/.
| Date made available | 24 Jul 2019 |
|---|---|
| Publisher | Zenodo |
Datasets
-
H2020 OPERA Project: Power Take-Off and Control Law testing in MARMOK-A-5 Wave Energy Converter at BiMEP
Ruiz Minguela, P. (Creator), Aldaiturriaga, E. (Creator) & Faÿ, F.-X. (Creator), TECNALIA, 24 Jul 2019
DOI: 10.5281/zenodo.3349538, https://cordis.europa.eu/project/id/654444 and one more link, https://ec.europa.eu/research/participants/documents/downloadPublic?documentIds=080166e5c63c9c5b&appId=PPGMS (show fewer)
Dataset
File
Cite this
- DataSetCite