Abstract
One of the goals of sustainable development applied to bridge infrastructure is to provide bridge owners with strengthening solutions that may lead to an increase of existing structures service life. In the case of steel bridges, the assessment of the remaining service life is most often linked to the determination of the structural deterioration caused by corrosion and fatigue. Damage caused by fatigue is very difficult to assess before crack initiation, and is more bound to occur in old structures, for which the phenomenon was not taken into account in design before 1970. In addition, old steel materials present a more brittle behavior. In answer to these challenges, the FASSTbridge project, financed through European Infravation call, aimed at developing a pre-cracking fatigue assessment and strengthening methodology for steel bridges based on the technology of adhesively bonded composite. The proposed article presents some of the results of this project.
| Original language | English |
|---|---|
| Title of host publication | IABSE Symposium, Nantes 2018 |
| Subtitle of host publication | Tomorrow's Megastructures |
| Publisher | International Association for Bridge and Structural Engineering (IABSE) |
| Pages | S21-35-S21-44 |
| ISBN (Electronic) | 9783857481611 |
| Publication status | Published - 2018 |
| Event | 40th IABSE Symposium in Nantes 2018: Tomorrow's Megastructures - Nantes, France Duration: 19 Sept 2018 → 21 Sept 2018 |
Publication series
| Name | IABSE Symposium, Nantes 2018: Tomorrow's Megastructures |
|---|
Conference
| Conference | 40th IABSE Symposium in Nantes 2018: Tomorrow's Megastructures |
|---|---|
| Country/Territory | France |
| City | Nantes |
| Period | 19/09/18 → 21/09/18 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Adhesive
- Application
- CFRP
- Fatigue
- Methodology
- Steel bridges
- Strengthening system
Fingerprint
Dive into the research topics of 'Development and application of FASSTbridge solution to Jarama bridge (fast and effective solution for steel bridges lifetime extension)'. Together they form a unique fingerprint.Cite this