Economical and technical viability of demand response in the spanish power system: the "optiges" project

Iñigo Cobelo, José Emilio Rodriguez, Maialen Boyra, Jon Anduaga, Antonio Castellanos

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

3 Citations (Scopus)

Abstract

This paper presents a project that is being carried out by Endesa in Spain with the aim of controlling peak demand by modifying the consumption of customers within the small and medium enterprise sector. A full load control architecture is being developed and different pilot tests are being specified.

Original languageEnglish
Title of host publicationCIRED seminar 2008
Subtitle of host publicationSmartGrids for distribution
Edition12380
DOIs
Publication statusPublished - 2008
EventCIRED Seminar 2008: SmartGrids for Distribution - Frankfurt, Germany
Duration: 23 Jun 200824 Jun 2008

Publication series

NameIET Seminar Digest
Number12380
Volume2008

Conference

ConferenceCIRED Seminar 2008: SmartGrids for Distribution
Country/TerritoryGermany
CityFrankfurt
Period23/06/0824/06/08

Fingerprint