TY - JOUR
T1 - Integration of Drone-Based 3D Scanning and BIM for Automated Construction Progress Control
AU - Tárrago Garay, Nerea
AU - Jimenez Fernandez, Jose Carlos
AU - San Mateos Carreton, Rosa
AU - Montes Grova, Marco Antonio
AU - Kruth, Oskari
AU - Elguezabal, Peru
N1 - Publisher Copyright:
© 2025 by the authors.
PY - 2025/10
Y1 - 2025/10
N2 - The work progress control is a key aspect for correcting deviations in construction, but currently is a task still carried out very manually by personnel moved to the execution place. This work proposes to digitize and automate the procedure through the combination and contrast of digital models of the actual state of the work and the theoretical planning. The models of the real situation are generated from the laser scanning executed by drones, the theoretical planning is reflected in the BIM4D models of the project, and their combination is automated with Feature Manipulation Engine (FME) visual programming routines. A web-based digital twin platform allows access to the end user of the service in an agile way. The methodology developed has been validated with its application on a residential building in the structural erection phase in Helsinki (Finland).
AB - The work progress control is a key aspect for correcting deviations in construction, but currently is a task still carried out very manually by personnel moved to the execution place. This work proposes to digitize and automate the procedure through the combination and contrast of digital models of the actual state of the work and the theoretical planning. The models of the real situation are generated from the laser scanning executed by drones, the theoretical planning is reflected in the BIM4D models of the project, and their combination is automated with Feature Manipulation Engine (FME) visual programming routines. A web-based digital twin platform allows access to the end user of the service in an agile way. The methodology developed has been validated with its application on a residential building in the structural erection phase in Helsinki (Finland).
KW - 3D point cloud
KW - BIM4D
KW - construction progress control
KW - digital data integration
KW - drone
KW - FME
KW - scan
UR - https://www.scopus.com/pages/publications/105018854090
U2 - 10.3390/buildings15193487
DO - 10.3390/buildings15193487
M3 - Article
AN - SCOPUS:105018854090
SN - 2075-5309
VL - 15
JO - Buildings
JF - Buildings
IS - 19
M1 - 3487
ER -