Optimal preventive maintenance planning for water spray system of drum shearer

  • S. H. Hoseinie
  • , B. Ghodrati
  • , D. Galar
  • , E. Juuso

Research output: Contribution to journalConference articlepeer-review

3 Citations (Scopus)

Abstract

Water spray system is one of the most important parts of rock cutting machines, especially the drum shearer. Field data shows that the maintenance of this system is time-consuming and causes major downtimes in the coal mines' production process. Therefore, it is essential to find an optimum preventive maintenance task and intervals, to reduce the downtime and minimize the associated costs of the machine. In this paper, in order to suggest an optimum preventive maintenance plan, a parametric failure and reliability analysis was done on available data from an Iranian longwall coal mine over the two years. A reliability-based cost modelling was implemented to identify the optimum maintenance interval and frequencies of restoration for the water spray system. In the study, a cost rate function was introduced in which an as-good-as-new effectiveness for restoration actions is considered. The results of the analysis showed that the minimum maintenance cost per unit of time for the studied machine, $19.54/hour, will be achieved within a range of intervals i.e. T=136 hours to T=142 hours.

Original languageEnglish
Pages (from-to)166-170
Number of pages5
JournalIFAC-PapersOnLine
Volume28
Issue number17
DOIs
Publication statusPublished - 1 Jul 2015
Externally publishedYes
Event4th IFAC Workshop on Mining, Mineral and Metal Processing, MMM 2015 - Oulu, Finland
Duration: 25 Aug 201527 Aug 2015

Keywords

  • Cost modelling
  • Drum shearer
  • Maintenance optimization
  • Water spray system