T1 - Economic Implications of DSO-TSO Coordination Schemes at a System Level and for Market Actors in case of Flexibility or Traditional Grid-based Solution
AU - Madina, Carlos
AU - Gonzalez-Garrido, Amaia
AU - Gomez-Arriola, Ines
N1 - Publisher Copyright:
© 2022 IEEE.
PY - 2022/10
Y1 - 2022/10
N2 - This paper proposes a methodology to evaluate the economic implication of the use of flexibility to solve both joint DSO-TSO and local DSO-specific congestion management needs. The presented methodology enables evaluating the economic implications at a system level and per market actor according to the selected DSO-TSO coordination scheme and given flexibility needs. Firstly, several DSO-TSO coordination schemes are presented to solve joint needs, in which market access to flexible resources at the distribution grid is enabled to a greater or lesser extent. Secondly, the use of flexibility is compared to traditional grid solutions (i.e., grid reinforcement, temporary commissioning services) to enable the DSO to make cost-efficient grid decisions in the short and medium term. Finally, the economic impact on flexible service providers at the distribution level is carefully presented. This methodology seeks to support energy policies and other regulatory decisions.
AB - This paper proposes a methodology to evaluate the economic implication of the use of flexibility to solve both joint DSO-TSO and local DSO-specific congestion management needs. The presented methodology enables evaluating the economic implications at a system level and per market actor according to the selected DSO-TSO coordination scheme and given flexibility needs. Firstly, several DSO-TSO coordination schemes are presented to solve joint needs, in which market access to flexible resources at the distribution grid is enabled to a greater or lesser extent. Secondly, the use of flexibility is compared to traditional grid solutions (i.e., grid reinforcement, temporary commissioning services) to enable the DSO to make cost-efficient grid decisions in the short and medium term. Finally, the economic impact on flexible service providers at the distribution level is carefully presented. This methodology seeks to support energy policies and other regulatory decisions.
KW - Energy Policy
KW - Network Congestion
KW - Power distribution networks
KW - Power markets
KW - Power system economics
KW - Energy Policy
KW - Network Congestion
KW - Power distribution networks
KW - Power markets
KW - Power system economics
UR - http://www.scopus.com/inward/record.url?scp=85141168772&partnerID=8YFLogxK
U2 - 10.1109/EEM54602.2022.9921075
DO - 10.1109/EEM54602.2022.9921075
M3 - Conference contribution
SN - 978-1-6654-0897-4
T3 - 2165-4077
BT - unknown
PB - IEEE
T2 - 18th International Conference on the European Energy Market, EEM 2022
Y2 - 13 September 2022 through 15 September 2022