Resumen
This paper analyses the relevance of the traffic delay generated during the A-8 Spanish Motorway maintenance activities in order to make recommendations for inclusion within the LCA of roads. Six congestion scenarios combining the level of service of the Motorway and the alternative N-634 route have been evaluated using two software packages: KyUCP (macro-simulation) and Aimsun (micro-simulation), whose results have been transferred into emissions using MOVES. After performing the LCA considering a functional unit of a 1-km lane with an analysis period of 30 years, results show the huge importance of this stage in all the scenarios analysed.
| Idioma original | Inglés |
|---|---|
| Número de artículo | 120050 |
| Publicación | Journal of Cleaner Production |
| Volumen | 253 |
| DOI | |
| Estado | Publicada - 20 abr 2020 |
| Publicado de forma externa | Sí |
ODS de las Naciones Unidas
Este resultado contribuye a los siguientes Objetivos de Desarrollo Sostenible
-
ODS 9: Industria, innovación e infraestructura
-
ODS 12: Producción y consumo responsables
Huella
Profundice en los temas de investigación de 'Influence of traffic delay produced during maintenance activities on the life cycle assessment of a road'. En conjunto forman una huella única.Citar esto
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver