Ir directamente a la navegación principal Ir directamente a la búsqueda Ir directamente al contenido principal

Nuclear engineering and technology transfer: The Spanish strategies to deal with US, french and german nuclear manufacturers, 1955–1985

  • Joseba De la Torre
  • , Mar Rubio-Varas*
  • , Esther M. Sánchez-Sánchez
  • , Gloria Sanz Lafuente
  • *Autor correspondiente de este trabajo
  • Public University of Navarre

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

4 Citas (Scopus)

Resumen

We analysed the process of construction and connection to the electrical grid of four Spanish nuclear power plants with different financial and technological foreign partners: those of Zorita (PWR by Westinghouse), Garoña (BWR by General Electric) and Vandellós I (GCR by EDF) (belonging to the first generation of atomic plants and producing electricity from 1969–72) and that of Trillo I (PWR by KWU, connected in 1988). These four examples allow us to observe how the learning curve of nuclear engineering and the acquisition of skills by Spanish companies evolved. Progressively the domestic industry achieved higher levels of participation, fostered by the Ministry of Industry and Energy. When the atomic plants under construction were paralysed by the nuclear moratorium of 1984, and several other projects were abandoned by the utilities along the way, Spain had developed an industrial sector around the fabrication of service components and engineering for nuclear power plants to compete internationally.

Idioma originalInglés
Páginas (desde-hasta)1435-1459
Número de páginas25
PublicaciónBusiness History
Volumen64
N.º8
DOI
EstadoPublicada - 2022
Publicado de forma externa

Huella

Profundice en los temas de investigación de 'Nuclear engineering and technology transfer: The Spanish strategies to deal with US, french and german nuclear manufacturers, 1955–1985'. En conjunto forman una huella única.

Citar esto