Temporary cable force monitoring techniques during bridge construction-phase: the Tajo River Viaduct experience: the Tajo River Viaduct experience

Alvaro Gaute-Alonso, David Garcia-Sanchez, Carlos Alonso-Cobo, Iñigo Calderon-Uriszar-Aldaca

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

6 Citas (Scopus)

Resumen

This article deals with the comparative analysis of current cable force monitoring techniques. In addition, the experience of three cable stress monitoring techniques during the construction phase is included: (a) the installation of load cells on the active anchorages of the cables, (b) the installation of unidirectional strain gauges, and (c) the evaluation of stresses in cables applying the vibrating wire technique by means of the installation of accelerometers. The main advantages and disadvantages of each technique analysed are highlighted in the Construction Process context of the Tajo Viaduct, one of the most singular viaducts recently built in Spain.
Idioma originalInglés
Número de artículo7689
Páginas (desde-hasta)7689
Número de páginas1
PublicaciónScientific Reports
Volumen12
N.º1
DOI
EstadoPublicada - dic 2022

Palabras clave

  • Building
  • Bridges
  • Monitoring techniques

Project and Funding Information

  • Project ID
  • info:eu-repo/grantAgreement/EC/H2020/769373/EU/Future proofing strategies FOr RESilient transport networks against Extreme Events/FORESEE
  • Funding Info
  • This work has received funding from the European’s Union Horizon 2020 research and innovation program under the Grant Agreement No. 769373 (FORESEE project).

Huella

Profundice en los temas de investigación de 'Temporary cable force monitoring techniques during bridge construction-phase: the Tajo River Viaduct experience: the Tajo River Viaduct experience'. En conjunto forman una huella única.

Citar esto